Welcome to Mannina construction's pump house story page 2.

A sample piece was  poured and stained. It was placed next to the pump house to be approve of the stone colors.

IMG_0232.jpg (57347 bytes)

 

  Here is the first test pour . This was done for stamp and color approval. This stamp had never been done before in this area. Not to mention the complex details that were about to be done on the pump house .

IMG_0246.jpg (51126 bytes)

 

The foam forming system framed and ready for concrete.

IMG_0233.jpg (54855 bytes)

Click here to continue story.

Click on yellow text below to see other pages.

CLICK A BOX BELOW TO SEE MORE.

*MANNINA CONSTRUCTION ON FRONT COVER 

*STONE PUMP HOUSE GALLERY  

*STONE ENTRANCE GATES GALLERY          

*FLATWORK STAMP GALLERY

*MIKE MANNINA'S UNITED STATES PATENT

*FOUNDATION REPAIR JOB

*WHAT'S NEW                         

*FOAM FOUNDATION IN BARRINGTON

     *   SEA WALL ON THE CHAIN O LAKES           

*HOW THE PUMP HOUSE WAS BUILT.

*PUMP HOUSE DETAIL DRAWING.

DECORATIVE CONCRETE STAIRCASE

*** LINKS ***

For more details e-mail us at, info@mannina.com

Mannina Construction, P.O. Box 368, Antioch, IL  60002

Web designer: DJ CREATIONS

Hit Counter